Procurement strategy

Set the procurement route on purpose.

ROUTE is procurement strategy for independent and SME property developers. The route, and who is appointed to deliver what, decided against your own objectives and locked before anyone is appointed.

FlitrrROUTELocked · v1
Fenwick Yard, Leeds
12 homes · Linked to the locked Brief
Procurement route
Design and Build
Chosen against five classified objectives
Scope of appointments
ArchitectDesign development, drawings and specificationStage 02
Quantity surveyorCost plan, tender documents and valuationsStage 02
ContractorConstruction of the works to the contractStage 04
7 appointments scoped: 6 at Stage 2, the contractor at Stage 4.
Fit checkQuality is non-negotiable, and design and build shifts design development to the contractor after appointment.1 warning
LockedLocked with the warning in view. PULSE shows the route read-only at initiation.

Most schemes take the route the last scheme took. ROUTE is built so the decision is taken, not inherited.

Large developers buy this decision from cost consultants and procurement advisers. ROUTE gives it to you directly, with the conventions they would cite on the table.

The old wayA route nobody chose
Procurement routewhatever the last project used
Scope of appointmentsspread across six emails
The gap between scopesfound at tender, priced as a claim
It felt decided. Nobody had decided it.

Choose the route. Scope the matrix. Lock the strategy.

A structured procurement decision you can take without a procurement background, and a record your appointments can be held to.

Procurement route
Design-Bid-BuildDesign-BuildConstruction ManagementManagement Contracting
1

Choose the procurement route

Four named routes, one decision. Link a PULSE project and the fit check reads its locked objectives and its funding as you choose, reporting the conventions that speak against each.

ArchitectStage 02
Quantity surveyorStage 02
ContractorStage 04
2

Scope every appointment

A scope matrix seeded from a template: who is appointed, what they cover, and at which stage. Consultants at Stage 2, the contractor at Stage 4. Edit, add and delete until it is your scheme’s own.

Route chosen
Every row scoped and staged
Lock strategy
3

Review it, then lock it

A completeness gate stands before the lock. Locked, the route, the matrix and the fit check freeze as one versioned record: a PDF for the tender pack, a register for the organisation, and an explicit new version the only way to change it.

Change the route. Watch the conventions speak.

Procurement advice is usually a meeting you cannot afford. ROUTE holds it as a rule table of nine conventions, written by hand, and reports the ones your project’s own facts make relevant.

A worked illustration on the engine’s own rule table: the same route always reports the same conventions.

FlitrrROUTERule table v1
Fenwick Yard, Leeds
Time, cost and quality non-negotiable · Debt-financed
Choose a procurement route
Design-BuildLump sum family
  • R3Warning

    under design and build the contractor owns design development after appointment, and value engineering commonly erodes specification. Where quality cannot move, retain design control through a traditional route, or fix the specification in the Employer's Requirements before contract.

The other eight of the nine rules had nothing to say.

ReportedNo route is ranked, and none is recommended. The convention is reported; the decision stays yours.

It reports the convention. It never picks the route.

A rule says what usually holds and why. It never says the route is wrong, never ranks the routes, and never recommends one. You decide against the convention knowingly, or with it confidently.

every sentence written by hand

Nothing the fit check says is generated. Each basis is a standard industry convention, held as data, returned in the same words every time.

9rules in the seed set

an absent fact is reported, never guessed

A rule runs only when every input it reads is present. No locked Brief means those rules are reported as skipped, not counted as passed, because “not checked” and “nothing to flag” are opposite messages.

0silent assumptions

Four named routes. No favourite.

The vocabulary the engine reasons in, each route carrying its family’s own trade.

01

Design-Bid-Build

Design completes before tender. The fullest design control and a committed contract sum, carried on the longer path to site.

Lump sum family
02

Design-Build

One contract for design and delivery. Usually the shortest path to site, with design development in the contractor’s hands after appointment.

Lump sum family
03

Construction Management

A manager coordinates packages you let directly. Starts early and absorbs change; cost is only known as packages are let.

Management family
04

Management Contracting

The management contractor lets the packages, so you hold one contract rather than many. The same early start, the same open cost.

Management family

Locked, the strategy stands over the appointments.

The lock freezes the route, the matrix and the fit check as one record. PULSE shows the locked route read-only at initiation, the PDF carries it into the room, and superseding it is an explicit new version, never a quiet edit.

Shape the tool you will procure with.

ROUTE is being shaped with a small group of property developers. If you want the procurement discipline before everyone else has it, talk to us.

Prefer email? Reach us directly at hello@flitrr.com.

Which products would you start with?

Leave them all off for the whole platform.