The 8-6-4 method

The Flitrr Framework.

One method for running a property development end to end, built for independent and SME property developers. Set the discipline once, and every stage, decision and risk answers to it.

Criticality is the centre of the method.

Every development is judged on five objectives. The framework’s first move is to define them, then to weigh them by criticality: which must hold firm, and which can move.

Protected. It must hold firm, because compromise causes damage you cannot recover.

Flexible. It can move, absorbing reality and still delivering.

The trap is protecting everything. A project with every objective set to hold has no give when reality bites, and is usually undeliverable. The framework forces the choice at the outset, while it is still cheap to make.

Five objectivesWeigh each by criticality, once, at the outset
Protecting 4 of 5
Room to absorb realitysome give
BalancedSome objectives hold firm, some can flex. The project can absorb reality and still deliver.

Tap an objective to reclassify it

Eight stages, and a gate between each.

Each stage has a single job, and meets the same four-part mandate. The gate between them is a deliberate decision, that the stage is genuinely done and still the project you committed to, decided each time rather than allowed to slide. Step through it.

Land and Site Acquisition
Stage 01 · the single job

Land and Site Acquisition

Confirm there is a feasible development here, and secure the site on terms that match your confidence.

Meets the four-part mandate
The gate, 01 to 02

Is this stage genuinely done, and still the project you committed to? The project advances only on yes.

STACK proves the scheme before you commit to itPULSE monitors stages 02 to 07, where a scheme is won or lostROUTE sets the appointments made at stages 02 and 04

Six principles hold it together.

They apply at every stage, on every scheme, whatever its size.

01

Objective criticality

Each objective is set to hold firm or to flex. That weighting governs every decision after it.

02

Cascading classification

The criticality set at the top flows down into every risk, action and decision.

03

Staged delivery with gates

The project advances one stage at a time, and only through a deliberate gate.

04

Locked baseline

The brief is version-locked, so change is a decision made on purpose, never a drift.

05

Proportional monitoring and escalation

Attention follows criticality. What matters most is watched hardest.

06

Tailoring within discipline

The method flexes to fit the scheme, without giving up the structure.

4mandates,
one standard

Every stage meets a four-part mandate.

Every stage you step through is defined the same way, against the same four-part mandate. It is how the framework holds eight different phases, from land acquisition to delivery and sales, to a single standard.

01

Purpose

What the stage is for, and what done well looks like.

02

Establish or achieve

The decisions to lock and the objectives to set or advance.

03

Produce

The outputs the stage must deliver to be done.

04

Success factors

What decides whether the stage succeeded, and where developers come unstuck.

The framework, and the products built on it.

The framework is the method. The products are how you run it. STACK carries it upstream to the decision: feasibility, budgets and funding, proven before you commit. PULSE runs the delivery: objectives classified, the brief locked, and only what matters monitored across every stage. ROUTE takes the procurement decision against those objectives: the route and the scope of every appointment, locked before anyone is appointed. More follow across the lifecycle, each built to the same discipline.

Or meet the products: STACK for the decision, PULSE for delivery, ROUTE for the appointments.